Pr 765 over Turabo River
FairPosted for loadCaguas Municipio, Puerto Rico · 5 KM South of Caguas · Structure no. 005341
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected August 2023
- Type
- Slab
- Concrete Continuous
- Length
- 101 ft
- 3 main spans
- Daily traffic
- 2,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 765 over Turabo River is a concrete continuous slab carrying Pr 765 over Turabo River in Caguas Municipio, Puerto Rico. It was built in 1950, so it is 75 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,200 vehicles a day, roughly 4% of them trucks, projected to reach 3,200 by 2025. The structure is 101 ft (30.7 m) long and 22 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 765 over Turabo River built?
It was built in 1950, making it 75 years old in 2025.
What condition is Pr 765 over Turabo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Pr 765 over Turabo River carry?
About 2,200 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 765 over Turabo River?
The structure is 101 ft (30.7 m) long with a longest span of 35 ft (10.8 m) and a deck 22 ft wide.
Who owns Pr 765 over Turabo River?
It is owned by the State Highway Agency.