Pr 103 12 KM over Boqueron Creek
FairPosted for loadCabo Rojo Municipio, Puerto Rico · 6 KM South of Cabo Rojo · Structure no. 001411
- Built
- 1933
- 92 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 8,300
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 103 12 KM over Boqueron Creek is a concrete slab carrying Pr 103 12 KM over Boqueron Creek in Cabo Rojo Municipio, Puerto Rico. It was built in 1933, so it is 92 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 8,300 vehicles a day, roughly 5% of them trucks, projected to reach 10,800 by 2025. The structure is 27 ft (8.2 m) long and 28 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 103 12 KM over Boqueron Creek built?
It was built in 1933, making it 92 years old in 2025.
What condition is Pr 103 12 KM over Boqueron Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Pr 103 12 KM over Boqueron Creek carry?
About 8,300 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 103 12 KM over Boqueron Creek?
The structure is 27 ft (8.2 m) long with a longest span of 23 ft (7 m) and a deck 28 ft wide.
Who owns Pr 103 12 KM over Boqueron Creek?
It is owned by the State Highway Agency.