Pr 167 19.45 KM over Cerro Gordo Creek
FairPosted for loadBayamon Municipio, Puerto Rico · 2.7 KM South of Bayamon · Structure no. 005941
- Built
- 1950
- 75 years old, rebuilt 1976
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 44,500
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 167 19.45 KM over Cerro Gordo Creek is a prestressed concrete stringer/multi-beam or girder carrying Pr 167 19.45 KM over Cerro Gordo Creek in Bayamon Municipio, Puerto Rico. It was built in 1950 and reconstructed in 1976, so it is 75 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 44,500 vehicles a day, roughly 4% of them trucks, projected to reach 52,100 by 2025. The structure is 80 ft (24.5 m) long and 102 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 167 19.45 KM over Cerro Gordo Creek built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1976.
What condition is Pr 167 19.45 KM over Cerro Gordo Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Pr 167 19.45 KM over Cerro Gordo Creek carry?
About 44,500 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 167 19.45 KM over Cerro Gordo Creek?
The structure is 80 ft (24.5 m) long with a longest span of 33 ft (10 m) and a deck 102 ft wide.
Who owns Pr 167 19.45 KM over Cerro Gordo Creek?
It is owned by the State Highway Agency.