0FF PR-156 AT13.50 over Tres Cruces River
GoodPosted for loadBarranquitas Municipio, Puerto Rico · 2.1 Km. Ne. Barranquitas · Structure no. 029511
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 29 ft
- 1 main span
- Daily traffic
- 100
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
0FF PR-156 AT13.50 over Tres Cruces River is a steel stringer/multi-beam or girder carrying 0FF PR-156 AT13.50 over Tres Cruces River in Barranquitas Municipio, Puerto Rico. It was built in 2011, so it is 14 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 150 by 2020. The structure is 29 ft (8.9 m) long and 21 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 0FF PR-156 AT13.50 over Tres Cruces River built?
It was built in 2011, making it 14 years old in 2025.
What condition is 0FF PR-156 AT13.50 over Tres Cruces River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does 0FF PR-156 AT13.50 over Tres Cruces River carry?
About 100 vehicles per day (2005 count), of which roughly 1% are trucks.
How long is 0FF PR-156 AT13.50 over Tres Cruces River?
The structure is 29 ft (8.9 m) long with a longest span of 28 ft (8.4 m) and a deck 21 ft wide.
Who owns 0FF PR-156 AT13.50 over Tres Cruces River?
It is owned by the City or Municipal Highway Agency.