Pr 651 0.85 KM over Creek
PoorPosted for loadArecibo Municipio, Puerto Rico · South of Barrio El Coto · Structure no. 013791
- Built
- 1955
- 70 years old
- Condition
- Poor
- inspected February 2024
- Type
- Culvert
- Concrete
- Length
- 21 ft
- 2 main spans
- Daily traffic
- 9,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 651 0.85 KM over Creek is a concrete culvert carrying Pr 651 0.85 KM over Creek in Arecibo Municipio, Puerto Rico. It was built in 1955, so it is 70 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 9,700 vehicles a day, roughly 4% of them trucks, projected to reach 12,700 by 2025. The structure is 21 ft (6.4 m) long and 62 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 651 0.85 KM over Creek built?
It was built in 1955, making it 70 years old in 2025.
What condition is Pr 651 0.85 KM over Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does Pr 651 0.85 KM over Creek carry?
About 9,700 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 651 0.85 KM over Creek?
The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3.1 m) and a deck 62 ft wide.
Who owns Pr 651 0.85 KM over Creek?
It is owned by the State Highway Agency.