Pr 109 6.55 KM over Espino Creek
FairAnasco Municipio, Puerto Rico · 3 KM East of AÑASCO · Structure no. 002201
- Built
- 1927
- 98 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 2,500
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 109 6.55 KM over Espino Creek is a steel stringer/multi-beam or girder carrying Pr 109 6.55 KM over Espino Creek in Anasco Municipio, Puerto Rico. It was built in 1927, so it is 98 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,500 vehicles a day, roughly 5% of them trucks, projected to reach 3,611 by 2025. The structure is 31 ft (9.4 m) long and 24 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 109 6.55 KM over Espino Creek built?
It was built in 1927, making it 98 years old in 2025.
What condition is Pr 109 6.55 KM over Espino Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Pr 109 6.55 KM over Espino Creek carry?
About 2,500 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 109 6.55 KM over Espino Creek?
The structure is 31 ft (9.4 m) long with a longest span of 31 ft (9.4 m) and a deck 24 ft wide.
Who owns Pr 109 6.55 KM over Espino Creek?
It is owned by the State Highway Agency.