Off PR-716 at 1.20 over Cuyon River
FairPosted for loadAibonito Municipio, Puerto Rico · 3.8 Km. South of Aibonito · Structure no. 029531
- Built
- 2011
- 14 years old
- Condition
- Fair
- inspected May 2023
- Type
- Tee Beam
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 1,000
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off PR-716 at 1.20 over Cuyon River is a concrete tee beam carrying Off PR-716 at 1.20 over Cuyon River in Aibonito Municipio, Puerto Rico. It was built in 2011, so it is 14 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,000 vehicles a day, roughly 1% of them trucks, projected to reach 1,400 by 2025. The structure is 25 ft (7.7 m) long and 17 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off PR-716 at 1.20 over Cuyon River built?
It was built in 2011, making it 14 years old in 2025.
What condition is Off PR-716 at 1.20 over Cuyon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Off PR-716 at 1.20 over Cuyon River carry?
About 1,000 vehicles per day (2005 count), of which roughly 1% are trucks.
How long is Off PR-716 at 1.20 over Cuyon River?
The structure is 25 ft (7.7 m) long with a longest span of 24 ft (7.4 m) and a deck 17 ft wide.
Who owns Off PR-716 at 1.20 over Cuyon River?
It is owned by the City or Municipal Highway Agency.