Pr 777 0.5 KM over Caguitas River
FairAguas Buenas Municipio, Puerto Rico · 2 KM South Aguas Buenas · Structure no. 020531
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected June 2024
- Type
- Slab
- Concrete Continuous
- Length
- 98 ft
- 3 main spans
- Daily traffic
- 1,000
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 777 0.5 KM over Caguitas River is a concrete continuous slab carrying Pr 777 0.5 KM over Caguitas River in Aguas Buenas Municipio, Puerto Rico. It was built in 1965, so it is 60 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: open, posting recommended but not legally implemented.
It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 1,400 by 2025. The structure is 98 ft (30 m) long and 25 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 777 0.5 KM over Caguitas River built?
It was built in 1965, making it 60 years old in 2025.
What condition is Pr 777 0.5 KM over Caguitas River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Pr 777 0.5 KM over Caguitas River carry?
About 1,000 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 777 0.5 KM over Caguitas River?
The structure is 98 ft (30 m) long with a longest span of 39 ft (12 m) and a deck 25 ft wide.
Who owns Pr 777 0.5 KM over Caguitas River?
It is owned by the State Highway Agency.