US Bridges

Pr 458 1.5 KM over Playuela Channel

FairPosted for load

Aguadilla Municipio, Puerto Rico · 1.5 KM West of Aguadilla · Structure no. 004871

Built
1939
86 years old, rebuilt 1984
Condition
Fair
inspected July 2024
Type
Tee Beam
Concrete
Length
50 ft
3 main spans
Daily traffic
700
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 458 1.5 KM over Playuela Channel is a concrete tee beam carrying Pr 458 1.5 KM over Playuela Channel in Aguadilla Municipio, Puerto Rico. It was built in 1939 and reconstructed in 1984, so it is 86 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 700 vehicles a day, roughly 2% of them trucks, projected to reach 1,000 by 2025. The structure is 50 ft (15.1 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesPr 458 1.5 KM
CrossesPlayuela Channel
Location1.5 KM West of Aguadilla
RouteState Highway 458
Coordinates18.45863, -67.16248
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating16 US tons
Inventory rating9.9 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length50 ft (15.1 m)
Longest span26 ft (7.8 m)
Deck width35 ft (10.8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic700 (2017)
Projected traffic1,000 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$382,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 458 1.5 KM over Playuela Channel built?

It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1984.

What condition is Pr 458 1.5 KM over Playuela Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Pr 458 1.5 KM over Playuela Channel carry?

About 700 vehicles per day (2017 count), of which roughly 2% are trucks.

How long is Pr 458 1.5 KM over Playuela Channel?

The structure is 50 ft (15.1 m) long with a longest span of 26 ft (7.8 m) and a deck 35 ft wide.

Who owns Pr 458 1.5 KM over Playuela Channel?

It is owned by the State Highway Agency.