US Bridges

Pr 2 131.6 KM over Dirt Road

Fair

Aguada Municipio, Puerto Rico · 4 KM W S W of Moca · Structure no. 007881

Built
1962
63 years old, rebuilt 1996
Condition
Fair
inspected October 2024
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
35,900
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 2 131.6 KM over Dirt Road is a concrete culvert carrying Pr 2 131.6 KM over Dirt Road in Aguada Municipio, Puerto Rico. It was built in 1962 and reconstructed in 1996, so it is 63 years old, older than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 35,900 vehicles a day, roughly 5% of them trucks, projected to reach 55,300 by 2025. The structure is 30 ft (9 m) long and 113 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesPr 2 131.6 KM
CrossesDirt Road
Location4 KM W S W of Moca
RouteInterstate 2
Coordinates18.39281, -67.15352
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating44 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 20
Structure length30 ft (9 m)
Longest span13 ft (4.1 m)
Deck width113 ft (34.3 m)
Roadway width88 ft (26.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35,900 (2017)
Projected traffic55,300 by 2025
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 2 131.6 KM over Dirt Road built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1996.

What condition is Pr 2 131.6 KM over Dirt Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Pr 2 131.6 KM over Dirt Road carry?

About 35,900 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 2 131.6 KM over Dirt Road?

The structure is 30 ft (9 m) long with a longest span of 13 ft (4.1 m) and a deck 113 ft wide.

Who owns Pr 2 131.6 KM over Dirt Road?

It is owned by the State Highway Agency.