Pr 115 17.5 KM over Grande River
FairPosted for loadAguada Municipio, Puerto Rico · 3.5 KM North of Rincon · Structure no. 000621
- Built
- 1915
- 110 years old, rebuilt 1972
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 37 ft
- 1 main span
- Daily traffic
- 7,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 115 17.5 KM over Grande River is a steel stringer/multi-beam or girder carrying Pr 115 17.5 KM over Grande River in Aguada Municipio, Puerto Rico. It was built in 1915 and reconstructed in 1972, so it is 110 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,200 vehicles a day, roughly 5% of them trucks, projected to reach 9,400 by 2025. The structure is 37 ft (11.3 m) long and 22 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 115 17.5 KM over Grande River built?
It was built in 1915, making it 110 years old in 2025. It was reconstructed in 1972.
What condition is Pr 115 17.5 KM over Grande River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Pr 115 17.5 KM over Grande River carry?
About 7,200 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 115 17.5 KM over Grande River?
The structure is 37 ft (11.3 m) long with a longest span of 33 ft (10 m) and a deck 22 ft wide.
Who owns Pr 115 17.5 KM over Grande River?
It is owned by the State Highway Agency.