US Bridges

Pr 10 30.42 KM over Pr 123

GoodClosed to traffic

Adjuntas Municipio, Puerto Rico · 2.1 KM Northwest Adjuntas · Structure no. 029841

Built
2013
12 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
643 ft
5 main spans
Daily traffic
7,800
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 10 30.42 KM over Pr 123 is a prestressed concrete stringer/multi-beam or girder carrying Pr 10 30.42 KM over Pr 123 in Adjuntas Municipio, Puerto Rico. It was built in 2013, so it is 12 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: closed to all traffic.

It carries about 7,800 vehicles a day, roughly 4% of them trucks, projected to reach 10,100 by 2025. The structure is 643 ft (196 m) long and 59 ft wide. If it were closed, the detour would be 7.5 mi (12 km).

CarriesPr 10 30.42 KM
CrossesPr 123
Location2.1 KM Northwest Adjuntas
RouteState Highway 10
Coordinates18.18035, -66.73618
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourFoundations stable; scour above top of footing
Structural evaluation0: Immediate repair necessary to put back in service
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating0 US tons
Inventory rating0 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length643 ft (196 m)
Longest span138 ft (42 m)
Deck width59 ft (18.1 m)
Roadway width56 ft (17.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,800 (2017)
Projected traffic10,100 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed7.5 mi (12 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pr 10 30.42 KM over Pr 123 built?

It was built in 2013, making it 12 years old in 2025.

What condition is Pr 10 30.42 KM over Pr 123 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Pr 10 30.42 KM over Pr 123 carry?

About 7,800 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Pr 10 30.42 KM over Pr 123?

The structure is 643 ft (196 m) long with a longest span of 138 ft (42 m) and a deck 59 ft wide.

Who owns Pr 10 30.42 KM over Pr 123?

It is owned by the State Highway Agency.