US Bridges

Cnect PR123 0.2 KM over Cidra River

Good

Adjuntas Municipio, Puerto Rico · 0.2 KM S.E. Adjuntas · Structure no. 026791

Built
2000
25 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
99 ft
1 main span
Daily traffic
1,300
2017 count
Owner
State
State Highway Agency

About this bridge

Cnect PR123 0.2 KM over Cidra River is a prestressed concrete stringer/multi-beam or girder carrying Cnect PR123 0.2 KM over Cidra River in Adjuntas Municipio, Puerto Rico. It was built in 2000, so it is 25 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, roughly 4% of them trucks, projected to reach 1,800 by 2025. The structure is 99 ft (30.3 m) long and 39 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCnect PR123 0.2 KM
CrossesCidra River
Location0.2 KM S.E. Adjuntas
Coordinates18.16119, -66.72032
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.5 US tons
Inventory rating33 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length99 ft (30.3 m)
Longest span99 ft (30.3 m)
Deck width39 ft (11.9 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2017)
Projected traffic1,800 by 2025
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$25,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cnect PR123 0.2 KM over Cidra River built?

It was built in 2000, making it 25 years old in 2025.

What condition is Cnect PR123 0.2 KM over Cidra River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Cnect PR123 0.2 KM over Cidra River carry?

About 1,300 vehicles per day (2017 count), of which roughly 4% are trucks.

How long is Cnect PR123 0.2 KM over Cidra River?

The structure is 99 ft (30.3 m) long with a longest span of 99 ft (30.3 m) and a deck 39 ft wide.

Who owns Cnect PR123 0.2 KM over Cidra River?

It is owned by the State Highway Agency.