Off Pr 135 KM 15.8 over Guilarte River
FairAdjuntas Municipio, Puerto Rico · 2.9 KM E Int Pr 129 & · Structure no. 016711
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 70 ft
- 1 main span
- Daily traffic
- 2,500
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 135 KM 15.8 over Guilarte River is a prestressed concrete stringer/multi-beam or girder carrying Off Pr 135 KM 15.8 over Guilarte River in Adjuntas Municipio, Puerto Rico. It was built in 1978, so it is 47 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,500 vehicles a day, roughly 4% of them trucks, projected to reach 3,200 by 2025. The structure is 70 ft (21.2 m) long and 17 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 135 KM 15.8 over Guilarte River built?
It was built in 1978, making it 47 years old in 2025.
What condition is Off Pr 135 KM 15.8 over Guilarte River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Off Pr 135 KM 15.8 over Guilarte River carry?
About 2,500 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Off Pr 135 KM 15.8 over Guilarte River?
The structure is 70 ft (21.2 m) long with a longest span of 62 ft (19 m) and a deck 17 ft wide.
Who owns Off Pr 135 KM 15.8 over Guilarte River?
It is owned by the City or Municipal Highway Agency.