Pr 135 over Guayo River
FairAdjuntas Municipio, Puerto Rico · 10 KM West of Adjuntas · Structure no. 002771
- Built
- 1924
- 101 years old
- Condition
- Fair
- inspected June 2023
- Type
- Arch - Deck
- Concrete
- Length
- 72 ft
- 1 main span
- Daily traffic
- 5,500
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 135 over Guayo River is a concrete arch - deck carrying Pr 135 over Guayo River in Adjuntas Municipio, Puerto Rico. It was built in 1924, so it is 101 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,500 vehicles a day, roughly 2% of them trucks, projected to reach 7,000 by 2025. The structure is 72 ft (21.9 m) long and 21 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 135 over Guayo River built?
It was built in 1924, making it 101 years old in 2025.
What condition is Pr 135 over Guayo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Pr 135 over Guayo River carry?
About 5,500 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Pr 135 over Guayo River?
The structure is 72 ft (21.9 m) long with a longest span of 72 ft (21.9 m) and a deck 21 ft wide.
Who owns Pr 135 over Guayo River?
It is owned by the State Highway Agency.