East Prospect RD over Kreutz Creek
GoodYork County, Pennsylvania · 1.3 W of Delroy · Structure no. 000000000054063
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 57 ft
- 1 main span
- Daily traffic
- 5,698
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
East Prospect RD over Kreutz Creek is a prestressed concrete box beam or girders - multiple carrying East Prospect RD over Kreutz Creek in York County, Pennsylvania. It was built in 2018, so it is 7 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,698 vehicles a day, roughly 12% of them trucks, projected to reach 10,249 by 2032. The structure is 57 ft (17.4 m) long and 42 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was East Prospect RD over Kreutz Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is East Prospect RD over Kreutz Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does East Prospect RD over Kreutz Creek carry?
About 5,698 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is East Prospect RD over Kreutz Creek?
The structure is 57 ft (17.4 m) long with a longest span of 55 ft (16.8 m) and a deck 42 ft wide.
Who owns East Prospect RD over Kreutz Creek?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).