SR 1003 over Pa Tpk (I-76)

Good

York County, Pennsylvania · Fairview Twp/Sr 1003 · Structure no. 000000000048454

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
270 ft
2 main spans
Daily traffic
5,301
2024 count
Owner
State
State Highway Agency

About this bridge

SR 1003 over Pa Tpk (I-76) is a prestressed concrete continuous box beam or girders - multiple carrying SR 1003 over Pa Tpk (I-76) in York County, Pennsylvania. It was built in 2013, so it is 12 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,301 vehicles a day, roughly 7% of them trucks, projected to reach 14,652 by 2032. The structure is 270 ft (82.3 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 1003
CrossesPa Tpk (I-76)
LocationFairview Twp/Sr 1003
RouteState Highway 0
Coordinates40.20532, -76.85249
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.5 US tons
Inventory rating36.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length270 ft (82.3 m)
Longest span110 ft (33.5 m)
Deck width48 ft (14.5 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,301 (2024)
Projected traffic14,652 by 2032
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 1003 over Pa Tpk (I-76) built?

It was built in 2013, making it 12 years old in 2025.

What condition is SR 1003 over Pa Tpk (I-76) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does SR 1003 over Pa Tpk (I-76) carry?

About 5,301 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is SR 1003 over Pa Tpk (I-76)?

The structure is 270 ft (82.3 m) long with a longest span of 110 ft (33.5 m) and a deck 48 ft wide.

Who owns SR 1003 over Pa Tpk (I-76)?

It is owned by the State Highway Agency.