T759; Furnace Road over Cabin Creek
PoorPosted for loadYork County, Pennsylvania · 3 W. E.Prospect/Cabin Crk · Structure no. 000000000038159
- Built
- 1970
- 55 years old
- Condition
- Poor
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 223
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T759; Furnace Road over Cabin Creek is a prestressed concrete box beam or girders - multiple carrying T759; Furnace Road over Cabin Creek in York County, Pennsylvania. It was built in 1970, so it is 55 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 223 vehicles a day, roughly 5% of them trucks, projected to reach 400 by 2032. The structure is 35 ft (10.7 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Superstructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T759; Furnace Road over Cabin Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is T759; Furnace Road over Cabin Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2023.
How much traffic does T759; Furnace Road over Cabin Creek carry?
About 223 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is T759; Furnace Road over Cabin Creek?
The structure is 35 ft (10.7 m) long with a longest span of 33 ft (10.1 m) and a deck 26 ft wide.
Who owns T759; Furnace Road over Cabin Creek?
It is owned by the Town or Township Highway Agency.