T955 Slatehill RD over Yellow Breeches Creek
GoodPosted for loadYork County, Pennsylvania · Yel Br/@rossmoyne/Cumb Y4 · Structure no. 000000000038117
- Built
- 1899
- 126 years old, rebuilt 2022
- Condition
- Good
- inspected March 2023
- Type
- Arch - Deck
- Masonry
- Length
- 123 ft
- 4 main spans
- Daily traffic
- 3,188
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
T955 Slatehill RD over Yellow Breeches Creek is a masonry arch - deck carrying T955 Slatehill RD over Yellow Breeches Creek in York County, Pennsylvania. It was built in 1899 and reconstructed in 2022, so it is 126 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 3,188 vehicles a day, roughly 5% of them trucks, projected to reach 750 by 2032. The structure is 123 ft (37.5 m) long and 22 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T955 Slatehill RD over Yellow Breeches Creek built?
It was built in 1899, making it 126 years old in 2025. It was reconstructed in 2022.
What condition is T955 Slatehill RD over Yellow Breeches Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does T955 Slatehill RD over Yellow Breeches Creek carry?
About 3,188 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is T955 Slatehill RD over Yellow Breeches Creek?
The structure is 123 ft (37.5 m) long with a longest span of 33 ft (10.1 m) and a deck 22 ft wide.
Who owns T955 Slatehill RD over Yellow Breeches Creek?
It is owned by the County Highway Agency.