US Bridges

SR 2025 over Welty Run

Good

Westmoreland County, Pennsylvania · Mount Pleasant Township · Structure no. 000000000068658

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
795
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2025 over Welty Run is a prestressed concrete box beam or girders - multiple carrying SR 2025 over Welty Run in Westmoreland County, Pennsylvania. It was built in 2023, so it is 2 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 795 vehicles a day, roughly 6% of them trucks, projected to reach 845 by 2042. The structure is 40 ft (12.2 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSR 2025
CrossesWelty Run
LocationMount Pleasant Township
RouteState Highway 0
Coordinates40.20318, -79.437
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.1 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span37 ft (11.3 m)
Deck width29 ft (8.7 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic795 (2024)
Projected traffic845 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2025 over Welty Run built?

It was built in 2023, making it 2 years old in 2025.

What condition is SR 2025 over Welty Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 2025 over Welty Run carry?

About 795 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SR 2025 over Welty Run?

The structure is 40 ft (12.2 m) long with a longest span of 37 ft (11.3 m) and a deck 29 ft wide.

Who owns SR 2025 over Welty Run?

It is owned by the State Highway Agency.