Stevenson Blvd over Little Pucketa Creek
GoodWestmoreland County, Pennsylvania · City of New Kensington · Structure no. 000000000053288
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 20,754
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Stevenson Blvd over Little Pucketa Creek is a prestressed concrete box beam or girders - multiple carrying Stevenson Blvd over Little Pucketa Creek in Westmoreland County, Pennsylvania. It was built in 2016, so it is 9 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,754 vehicles a day, roughly 9% of them trucks, projected to reach 19,980 by 2037. The structure is 80 ft (24.4 m) long and 84 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stevenson Blvd over Little Pucketa Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is Stevenson Blvd over Little Pucketa Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Stevenson Blvd over Little Pucketa Creek carry?
About 20,754 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is Stevenson Blvd over Little Pucketa Creek?
The structure is 80 ft (24.4 m) long with a longest span of 76 ft (23.2 m) and a deck 84 ft wide.
Who owns Stevenson Blvd over Little Pucketa Creek?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).