SR 3111 over I-76 Trib Sewickley Crk
GoodWestmoreland County, Pennsylvania · New Stanton · Structure no. 000000000044412
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected May 2022
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 359 ft
- 2 main spans
- Daily traffic
- 10,431
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 3111 over I-76 Trib Sewickley Crk is a steel continuous stringer/multi-beam or girder carrying SR 3111 over I-76 Trib Sewickley Crk in Westmoreland County, Pennsylvania. It was built in 2008, so it is 17 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,431 vehicles a day, roughly 6% of them trucks, projected to reach 12,140 by 2040. The structure is 359 ft (109.4 m) long and 45 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 3111 over I-76 Trib Sewickley Crk built?
It was built in 2008, making it 17 years old in 2025.
What condition is SR 3111 over I-76 Trib Sewickley Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.
How much traffic does SR 3111 over I-76 Trib Sewickley Crk carry?
About 10,431 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is SR 3111 over I-76 Trib Sewickley Crk?
The structure is 359 ft (109.4 m) long with a longest span of 177 ft (53.9 m) and a deck 45 ft wide.
Who owns SR 3111 over I-76 Trib Sewickley Crk?
It is owned by the State Highway Agency.