Austraw Road over North Fork Trout Run
FairWestmoreland County, Pennsylvania · North of Ligonier Borough · Structure no. 000000000040747
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected April 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 341
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Austraw Road over North Fork Trout Run is a prestressed concrete box beam or girders - multiple carrying Austraw Road over North Fork Trout Run in Westmoreland County, Pennsylvania. It was built in 1999, so it is 26 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 341 vehicles a day, roughly 1% of them trucks, projected to reach 433 by 2037. The structure is 30 ft (9.1 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Austraw Road over North Fork Trout Run built?
It was built in 1999, making it 26 years old in 2025.
What condition is Austraw Road over North Fork Trout Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Austraw Road over North Fork Trout Run carry?
About 341 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is Austraw Road over North Fork Trout Run?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 28 ft wide.
Who owns Austraw Road over North Fork Trout Run?
It is owned by the Town or Township Highway Agency.