SR 0819 over Slate Creek
FairWestmoreland County, Pennsylvania · South Greensburg Borough · Structure no. 000000000036269
- Built
- 1937
- 88 years old, rebuilt 2009
- Condition
- Fair
- inspected June 2023
- Type
- Tee Beam
- Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 3,038
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0819 over Slate Creek is a concrete tee beam carrying SR 0819 over Slate Creek in Westmoreland County, Pennsylvania. It was built in 1937 and reconstructed in 2009, so it is 88 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,038 vehicles a day, roughly 9% of them trucks, projected to reach 3,548 by 2032. The structure is 34 ft (10.4 m) long and 47 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0819 over Slate Creek built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 2009.
What condition is SR 0819 over Slate Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does SR 0819 over Slate Creek carry?
About 3,038 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is SR 0819 over Slate Creek?
The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 47 ft wide.
Who owns SR 0819 over Slate Creek?
It is owned by the State Highway Agency.