SR 0366 over Pucketa Creek
FairWestmoreland County, Pennsylvania · Municipal. of Murrysville · Structure no. 000000000036205
- Built
- 1972
- 53 years old, rebuilt 2020
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 57 ft
- 1 main span
- Daily traffic
- 8,502
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0366 over Pucketa Creek is a prestressed concrete box beam or girders - multiple carrying SR 0366 over Pucketa Creek in Westmoreland County, Pennsylvania. It was built in 1972 and reconstructed in 2020, so it is 53 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,502 vehicles a day, roughly 19% of them trucks, projected to reach 8,786 by 2032. The structure is 57 ft (17.4 m) long and 94 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0366 over Pucketa Creek built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2020.
What condition is SR 0366 over Pucketa Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does SR 0366 over Pucketa Creek carry?
About 8,502 vehicles per day (2023 count), of which roughly 19% are trucks.
How long is SR 0366 over Pucketa Creek?
The structure is 57 ft (17.4 m) long with a longest span of 56 ft (17.1 m) and a deck 94 ft wide.
Who owns SR 0366 over Pucketa Creek?
It is owned by the State Highway Agency.