US Bridges

S. Baker Rd. T-412 over Middle Creek

Good

Wayne County, Pennsylvania · 1150FT NW of Tannery Rd. · Structure no. 000000000048293

Built
2013
12 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
39 ft
2 main spans
Daily traffic
250
2024 count
Owner
County
County Highway Agency

About this bridge

S. Baker Rd. T-412 over Middle Creek is a concrete culvert carrying S. Baker Rd. T-412 over Middle Creek in Wayne County, Pennsylvania. It was built in 2013, so it is 12 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 250 vehicles a day, projected to reach 306 by 2046. The structure is 39 ft (11.9 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS. Baker Rd. T-412
CrossesMiddle Creek
Location1150FT NW of Tannery Rd.
RouteCity Street 0
Coordinates41.50081, -75.37541
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating37.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length39 ft (11.9 m)
Longest span19 ft (5.8 m)
Deck width27 ft (8.2 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2024)
Projected traffic306 by 2046
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S. Baker Rd. T-412 over Middle Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is S. Baker Rd. T-412 over Middle Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does S. Baker Rd. T-412 over Middle Creek carry?

About 250 vehicles per day (2024 count).

How long is S. Baker Rd. T-412 over Middle Creek?

The structure is 39 ft (11.9 m) long with a longest span of 19 ft (5.8 m) and a deck 27 ft wide.

Who owns S. Baker Rd. T-412 over Middle Creek?

It is owned by the County Highway Agency.