US Bridges

Stockport Turnpike over Lake Como Outlet

Good

Wayne County, Pennsylvania · 75 Ft South of SR 4033 · Structure no. 000000000047867

Built
2012
13 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
28 ft
1 main span
Daily traffic
75
2013 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Stockport Turnpike over Lake Como Outlet is a steel stringer/multi-beam or girder carrying Stockport Turnpike over Lake Como Outlet in Wayne County, Pennsylvania. It was built in 2012, so it is 13 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 80 by 2033. The structure is 28 ft (8.5 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesStockport Turnpike
CrossesLake Como Outlet
Location75 Ft South of SR 4033
RouteCity Street 0
Coordinates41.85018, -75.34369
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83 US tons
Inventory rating49.1 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span26 ft (7.9 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2013)
Projected traffic80 by 2033
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stockport Turnpike over Lake Como Outlet built?

It was built in 2012, making it 13 years old in 2025.

What condition is Stockport Turnpike over Lake Como Outlet in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Stockport Turnpike over Lake Como Outlet carry?

About 75 vehicles per day (2013 count).

How long is Stockport Turnpike over Lake Como Outlet?

The structure is 28 ft (8.5 m) long with a longest span of 26 ft (7.9 m) and a deck 25 ft wide.

Who owns Stockport Turnpike over Lake Como Outlet?

It is owned by the Town or Township Highway Agency.