US Bridges

SR 4008 Niagra Dr. over Outlet to Howell Pond

Good

Wayne County, Pennsylvania · 0.2 Miles West of TR 247 · Structure no. 000000000044088

Built
2007
18 years old
Condition
Good
inspected May 2021
Type
Culvert
Concrete
Length
26 ft
1 main span
Daily traffic
48
2024 count
Owner
State
State Highway Agency

About this bridge

SR 4008 Niagra Dr. over Outlet to Howell Pond is a concrete culvert carrying SR 4008 Niagra Dr. over Outlet to Howell Pond in Wayne County, Pennsylvania. It was built in 2007, so it is 18 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 48 vehicles a day, roughly 11% of them trucks, projected to reach 106 by 2032. The structure is 26 ft (7.9 m) long and 26 ft wide.

CarriesSR 4008 Niagra Dr.
CrossesOutlet to Howell Pond
Location0.2 Miles West of TR 247
RouteState Highway 0
Coordinates41.75057, -75.35328
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating59 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length26 ft (7.9 m)
Longest span20 ft (6.1 m)
Deck width26 ft (8 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic48 (2024)
Projected traffic106 by 2032
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 4008 Niagra Dr. over Outlet to Howell Pond built?

It was built in 2007, making it 18 years old in 2025.

What condition is SR 4008 Niagra Dr. over Outlet to Howell Pond in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2021.

How much traffic does SR 4008 Niagra Dr. over Outlet to Howell Pond carry?

About 48 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is SR 4008 Niagra Dr. over Outlet to Howell Pond?

The structure is 26 ft (7.9 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.

Who owns SR 4008 Niagra Dr. over Outlet to Howell Pond?

It is owned by the State Highway Agency.