US Bridges

SR 0084 I-84 WB over Wilcox Creek &twp RD 325

Fair

Wayne County, Pennsylvania · Sterling Tp .5M E CO Line · Structure no. 000000000035434

Built
1973
52 years old, rebuilt 1990
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
279 ft
3 main spans
Daily traffic
7,473
2024 count
Owner
State
State Highway Agency

About this bridge

SR 0084 I-84 WB over Wilcox Creek &twp RD 325 is a prestressed concrete stringer/multi-beam or girder carrying SR 0084 I-84 WB over Wilcox Creek &twp RD 325 in Wayne County, Pennsylvania. It was built in 1973 and reconstructed in 1990, so it is 52 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,473 vehicles a day, roughly 43% of them trucks, projected to reach 12,742 by 2032. The structure is 279 ft (85 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 0084 I-84 WB
CrossesWilcox Creek &twp RD 325
LocationSterling Tp .5M E CO Line
RouteInterstate 84
Coordinates41.36689, -75.43824
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length279 ft (85 m)
Longest span92 ft (28 m)
Deck width44 ft (13.3 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,473 (2024)
Projected traffic12,742 by 2032
Trucks43%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$646,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 0084 I-84 WB over Wilcox Creek &twp RD 325 built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 1990.

What condition is SR 0084 I-84 WB over Wilcox Creek &twp RD 325 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does SR 0084 I-84 WB over Wilcox Creek &twp RD 325 carry?

About 7,473 vehicles per day (2024 count), of which roughly 43% are trucks.

How long is SR 0084 I-84 WB over Wilcox Creek &twp RD 325?

The structure is 279 ft (85 m) long with a longest span of 92 ft (28 m) and a deck 44 ft wide.

Who owns SR 0084 I-84 WB over Wilcox Creek &twp RD 325?

It is owned by the State Highway Agency.