US Bridges

Pa Tpk 0576 over S.R. 4010

Good

Washington County, Pennsylvania · Robinson Township · Structure no. 000000000068164

Built
2016
9 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
151 ft
1 main span
Daily traffic
1,000
2016 count
Owner
Toll Authority
State Toll Authority

About this bridge

Pa Tpk 0576 over S.R. 4010 is a prestressed concrete stringer/multi-beam or girder carrying Pa Tpk 0576 over S.R. 4010 in Washington County, Pennsylvania. It was built in 2016, so it is 9 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 20% of them trucks, projected to reach 1,200 by 2040. The structure is 151 ft (46 m) long and 46 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesPa Tpk 0576
CrossesS.R. 4010
LocationRobinson Township
Coordinates40.40002, -80.29604
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.1 US tons
Inventory rating45.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length151 ft (46 m)
Longest span145 ft (44.2 m)
Deck width46 ft (13.9 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2016)
Projected traffic1,200 by 2040
Trucks20%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.2 mi (18 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pa Tpk 0576 over S.R. 4010 built?

It was built in 2016, making it 9 years old in 2025.

What condition is Pa Tpk 0576 over S.R. 4010 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Pa Tpk 0576 over S.R. 4010 carry?

About 1,000 vehicles per day (2016 count), of which roughly 20% are trucks.

How long is Pa Tpk 0576 over S.R. 4010?

The structure is 151 ft (46 m) long with a longest span of 145 ft (44.2 m) and a deck 46 ft wide.

Who owns Pa Tpk 0576 over S.R. 4010?

It is owned by the State Toll Authority.