US Bridges

SR 2030 over Gorby Run

Good

Washington County, Pennsylvania · California Borough · Structure no. 000000000057133

Built
2019
6 years old
Condition
Good
inspected April 2022
Type
Culvert
Concrete
Length
29 ft
1 main span
Daily traffic
1,013
2023 count
Owner
State
State Highway Agency

About this bridge

SR 2030 over Gorby Run is a concrete culvert carrying SR 2030 over Gorby Run in Washington County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,013 vehicles a day, roughly 13% of them trucks, projected to reach 800 by 2041. The structure is 29 ft (8.8 m) long and 37 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 2030
CrossesGorby Run
LocationCalifornia Borough
RouteState Highway 0
Coordinates40.08506, -79.92414
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.6 US tons
Inventory rating50 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length29 ft (8.8 m)
Longest span27 ft (8.2 m)
Deck width37 ft (11.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,013 (2023)
Projected traffic800 by 2041
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2030 over Gorby Run built?

It was built in 2019, making it 6 years old in 2025.

What condition is SR 2030 over Gorby Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does SR 2030 over Gorby Run carry?

About 1,013 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is SR 2030 over Gorby Run?

The structure is 29 ft (8.8 m) long with a longest span of 27 ft (8.2 m) and a deck 37 ft wide.

Who owns SR 2030 over Gorby Run?

It is owned by the State Highway Agency.