SR 3035 over Templeton F Wheeling Ck.
FairWashington County, Pennsylvania · West Finley Township · Structure no. 000000000035082
- Built
- 1961
- 64 years old, rebuilt 2011
- Condition
- Fair
- inspected June 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 18
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 3035 over Templeton F Wheeling Ck. is a prestressed concrete box beam or girders - multiple carrying SR 3035 over Templeton F Wheeling Ck. in Washington County, Pennsylvania. It was built in 1961 and reconstructed in 2011, so it is 64 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18 vehicles a day, roughly 11% of them trucks, projected to reach 58 by 2032. The structure is 52 ft (15.8 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 3035 over Templeton F Wheeling Ck. built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 2011.
What condition is SR 3035 over Templeton F Wheeling Ck. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2022.
How much traffic does SR 3035 over Templeton F Wheeling Ck. carry?
About 18 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 3035 over Templeton F Wheeling Ck.?
The structure is 52 ft (15.8 m) long with a longest span of 52 ft (15.8 m) and a deck 28 ft wide.
Who owns SR 3035 over Templeton F Wheeling Ck.?
It is owned by the State Highway Agency.