T-539 Valastiak RD over Over Lt.Brokenstraw Ck.
FairWarren County, Pennsylvania · Freehold Township · Structure no. 000000000034248
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 150
- 2005 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-539 Valastiak RD over Over Lt.Brokenstraw Ck. is a prestressed concrete box beam or girders - multiple carrying T-539 Valastiak RD over Over Lt.Brokenstraw Ck. in Warren County, Pennsylvania. It was built in 1993, so it is 32 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, projected to reach 210 by 2029. The structure is 67 ft (20.4 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-539 Valastiak RD over Over Lt.Brokenstraw Ck. built?
It was built in 1993, making it 32 years old in 2025.
What condition is T-539 Valastiak RD over Over Lt.Brokenstraw Ck. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does T-539 Valastiak RD over Over Lt.Brokenstraw Ck. carry?
About 150 vehicles per day (2005 count).
How long is T-539 Valastiak RD over Over Lt.Brokenstraw Ck.?
The structure is 67 ft (20.4 m) long with a longest span of 65 ft (19.8 m) and a deck 24 ft wide.
Who owns T-539 Valastiak RD over Over Lt.Brokenstraw Ck.?
It is owned by the Town or Township Highway Agency.