T-512 Slab Furnace over Over East Sandy Creek
FairVenango County, Pennsylvania · Rockland Township · Structure no. 000000000033926
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 96 ft
- 1 main span
- Daily traffic
- 100
- 2014 count
- Owner
- County
- County Highway Agency
About this bridge
T-512 Slab Furnace over Over East Sandy Creek is a prestressed concrete box beam or girders - multiple carrying T-512 Slab Furnace over Over East Sandy Creek in Venango County, Pennsylvania. It was built in 1992, so it is 33 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 4% of them trucks, projected to reach 140 by 2034. The structure is 96 ft (29.3 m) long and 29 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-512 Slab Furnace over Over East Sandy Creek built?
It was built in 1992, making it 33 years old in 2025.
What condition is T-512 Slab Furnace over Over East Sandy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does T-512 Slab Furnace over Over East Sandy Creek carry?
About 100 vehicles per day (2014 count), of which roughly 4% are trucks.
How long is T-512 Slab Furnace over Over East Sandy Creek?
The structure is 96 ft (29.3 m) long with a longest span of 93 ft (28.3 m) and a deck 29 ft wide.
Who owns T-512 Slab Furnace over Over East Sandy Creek?
It is owned by the County Highway Agency.