US Bridges

SR 80 EB over T-388 Coal Valley RD

Fair

Venango County, Pennsylvania · Clinton Township · Structure no. 000000000033712

Built
1966
59 years old, rebuilt 1982
Condition
Fair
inspected July 2023
Type
Tee Beam
Concrete
Length
95 ft
3 main spans
Daily traffic
11,022
2024 count
Owner
State
State Highway Agency

About this bridge

SR 80 EB over T-388 Coal Valley RD is a concrete tee beam carrying SR 80 EB over T-388 Coal Valley RD in Venango County, Pennsylvania. It was built in 1966 and reconstructed in 1982, so it is 59 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,022 vehicles a day, roughly 42% of them trucks, projected to reach 15,357 by 2032. The structure is 95 ft (29 m) long and 46 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 80 EB
CrossesT-388 Coal Valley RD
LocationClinton Township
RouteInterstate 80
Coordinates41.19228, -79.84421
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating48 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length95 ft (29 m)
Longest span34 ft (10.4 m)
Deck width46 ft (13.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,022 (2024)
Projected traffic15,357 by 2032
Trucks42%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 80 EB over T-388 Coal Valley RD built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1982.

What condition is SR 80 EB over T-388 Coal Valley RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does SR 80 EB over T-388 Coal Valley RD carry?

About 11,022 vehicles per day (2024 count), of which roughly 42% are trucks.

How long is SR 80 EB over T-388 Coal Valley RD?

The structure is 95 ft (29 m) long with a longest span of 34 ft (10.4 m) and a deck 46 ft wide.

Who owns SR 80 EB over T-388 Coal Valley RD?

It is owned by the State Highway Agency.