SR 8 Pittsburgh RD over Over SR 80 Eb/Wb
FairVenango County, Pennsylvania · Barkeyville Borough · Structure no. 000000000033640
- Built
- 1965
- 60 years old, rebuilt 2013
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 224 ft
- 5 main spans
- Daily traffic
- 7,022
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 8 Pittsburgh RD over Over SR 80 Eb/Wb is a steel continuous stringer/multi-beam or girder carrying SR 8 Pittsburgh RD over Over SR 80 Eb/Wb in Venango County, Pennsylvania. It was built in 1965 and reconstructed in 2013, so it is 60 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,022 vehicles a day, roughly 13% of them trucks, projected to reach 12,326 by 2032. The structure is 224 ft (68.3 m) long and 64 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 8 Pittsburgh RD over Over SR 80 Eb/Wb built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2013.
What condition is SR 8 Pittsburgh RD over Over SR 80 Eb/Wb in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does SR 8 Pittsburgh RD over Over SR 80 Eb/Wb carry?
About 7,022 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is SR 8 Pittsburgh RD over Over SR 80 Eb/Wb?
The structure is 224 ft (68.3 m) long with a longest span of 58 ft (17.7 m) and a deck 64 ft wide.
Who owns SR 8 Pittsburgh RD over Over SR 80 Eb/Wb?
It is owned by the State Highway Agency.