US Bridges

T-723 (scott Rd.) over N. Fork Cowanesque River

Good

Tioga County, Pennsylvania · 4 Mi. NW of Westfield · Structure no. 000000000056946

Built
2019
6 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
35 ft
1 main span
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T-723 (scott Rd.) over N. Fork Cowanesque River is a concrete culvert carrying T-723 (scott Rd.) over N. Fork Cowanesque River in Tioga County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 77 by 2045. The structure is 35 ft (10.7 m) long and 32 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesT-723 (scott Rd.)
CrossesN. Fork Cowanesque River
Location4 Mi. NW of Westfield
RouteCity Street 0
Coordinates41.94813, -77.58605
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating40 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span32 ft (9.8 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic77 by 2045
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T-723 (scott Rd.) over N. Fork Cowanesque River built?

It was built in 2019, making it 6 years old in 2025.

What condition is T-723 (scott Rd.) over N. Fork Cowanesque River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does T-723 (scott Rd.) over N. Fork Cowanesque River carry?

About 50 vehicles per day (2023 count).

How long is T-723 (scott Rd.) over N. Fork Cowanesque River?

The structure is 35 ft (10.7 m) long with a longest span of 32 ft (9.8 m) and a deck 32 ft wide.

Who owns T-723 (scott Rd.) over N. Fork Cowanesque River?

It is owned by the Town or Township Highway Agency.