SR 15 Sbl over Tioga River and Railroad
GoodTioga County, Pennsylvania · 2 Mi. N. of Tioga Boro · Structure no. 000000000045156
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 1,699 ft
- 11 main spans
- Daily traffic
- 4,909
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 15 Sbl over Tioga River and Railroad is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 15 Sbl over Tioga River and Railroad in Tioga County, Pennsylvania. It was built in 2008, so it is 17 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,909 vehicles a day, roughly 25% of them trucks, projected to reach 6,273 by 2032. The structure is 1,699 ft (517.9 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 15 Sbl over Tioga River and Railroad built?
It was built in 2008, making it 17 years old in 2025.
What condition is SR 15 Sbl over Tioga River and Railroad in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does SR 15 Sbl over Tioga River and Railroad carry?
About 4,909 vehicles per day (2024 count), of which roughly 25% are trucks.
How long is SR 15 Sbl over Tioga River and Railroad?
The structure is 1,699 ft (517.9 m) long with a longest span of 161 ft (49.1 m) and a deck 43 ft wide.
Who owns SR 15 Sbl over Tioga River and Railroad?
It is owned by the State Highway Agency.