US Bridges

SR 15 Southbound over SR 2022

Good

Tioga County, Pennsylvania · 3 Mile N. Covington · Structure no. 000000000042308

Built
2004
21 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
6,164
2024 count
Owner
State
State Highway Agency

About this bridge

SR 15 Southbound over SR 2022 is a prestressed concrete stringer/multi-beam or girder carrying SR 15 Southbound over SR 2022 in Tioga County, Pennsylvania. It was built in 2004, so it is 21 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,164 vehicles a day, roughly 51% of them trucks, projected to reach 6,136 by 2032. The structure is 130 ft (39.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 15 Southbound
CrossesSR 2022
Location3 Mile N. Covington
RouteU.S. Route 15
Coordinates41.54711, -77.12456
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating49.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length130 ft (39.6 m)
Longest span124 ft (37.8 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,164 (2024)
Projected traffic6,136 by 2032
Trucks51%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 15 Southbound over SR 2022 built?

It was built in 2004, making it 21 years old in 2025.

What condition is SR 15 Southbound over SR 2022 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR 15 Southbound over SR 2022 carry?

About 6,164 vehicles per day (2024 count), of which roughly 51% are trucks.

How long is SR 15 Southbound over SR 2022?

The structure is 130 ft (39.6 m) long with a longest span of 124 ft (37.8 m) and a deck 42 ft wide.

Who owns SR 15 Southbound over SR 2022?

It is owned by the State Highway Agency.