US Bridges

Future SR15 NB over Over SR 1001

Good

Tioga County, Pennsylvania · 0.5 M NW of Mansfield · Structure no. 000000000041460

Built
2001
24 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
148 ft
1 main span
Daily traffic
5,004
2023 count
Owner
State
State Highway Agency

About this bridge

Future SR15 NB over Over SR 1001 is a prestressed concrete stringer/multi-beam or girder carrying Future SR15 NB over Over SR 1001 in Tioga County, Pennsylvania. It was built in 2001, so it is 24 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,004 vehicles a day, roughly 20% of them trucks, projected to reach 4,616 by 2032. The structure is 148 ft (45.1 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFuture SR15 NB
CrossesOver SR 1001
Location0.5 M NW of Mansfield
RouteU.S. Route 15
Coordinates41.81888, -77.08997
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length148 ft (45.1 m)
Longest span140 ft (42.7 m)
Deck width43 ft (13 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,004 (2023)
Projected traffic4,616 by 2032
Trucks20%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Future SR15 NB over Over SR 1001 built?

It was built in 2001, making it 24 years old in 2025.

What condition is Future SR15 NB over Over SR 1001 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Future SR15 NB over Over SR 1001 carry?

About 5,004 vehicles per day (2023 count), of which roughly 20% are trucks.

How long is Future SR15 NB over Over SR 1001?

The structure is 148 ft (45.1 m) long with a longest span of 140 ft (42.7 m) and a deck 43 ft wide.

Who owns Future SR15 NB over Over SR 1001?

It is owned by the State Highway Agency.