Future SR15 NB over Over SR 1001
GoodTioga County, Pennsylvania · 0.5 M NW of Mansfield · Structure no. 000000000041460
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 148 ft
- 1 main span
- Daily traffic
- 5,004
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Future SR15 NB over Over SR 1001 is a prestressed concrete stringer/multi-beam or girder carrying Future SR15 NB over Over SR 1001 in Tioga County, Pennsylvania. It was built in 2001, so it is 24 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,004 vehicles a day, roughly 20% of them trucks, projected to reach 4,616 by 2032. The structure is 148 ft (45.1 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Future SR15 NB over Over SR 1001 built?
It was built in 2001, making it 24 years old in 2025.
What condition is Future SR15 NB over Over SR 1001 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Future SR15 NB over Over SR 1001 carry?
About 5,004 vehicles per day (2023 count), of which roughly 20% are trucks.
How long is Future SR15 NB over Over SR 1001?
The structure is 148 ft (45.1 m) long with a longest span of 140 ft (42.7 m) and a deck 43 ft wide.
Who owns Future SR15 NB over Over SR 1001?
It is owned by the State Highway Agency.