US Bridges

SR 2050 over Dundaff Creek

Good

Susquehanna County, Pennsylvania · 316 Feet East of TR 106 · Structure no. 000000000045978

Built
2010
15 years old
Condition
Good
inspected March 2024
Type
Frame
Concrete
Length
27 ft
1 main span
Daily traffic
384
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2050 over Dundaff Creek is a concrete frame carrying SR 2050 over Dundaff Creek in Susquehanna County, Pennsylvania. It was built in 2010, so it is 15 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 384 vehicles a day, roughly 6% of them trucks, projected to reach 327 by 2032. The structure is 27 ft (8.2 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 2050
CrossesDundaff Creek
Location316 Feet East of TR 106
RouteState Highway 0
Coordinates41.6564, -75.60307
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating45 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length27 ft (8.2 m)
Longest span25 ft (7.6 m)
Deck width32 ft (9.7 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic384 (2024)
Projected traffic327 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2050 over Dundaff Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is SR 2050 over Dundaff Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR 2050 over Dundaff Creek carry?

About 384 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SR 2050 over Dundaff Creek?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 32 ft wide.

Who owns SR 2050 over Dundaff Creek?

It is owned by the State Highway Agency.