US Bridges

SR 4012 over Tributary Ulsh Gap Run

Good

Snyder County, Pennsylvania · 2 MI NE of Bannerville · Structure no. 000000000052707

Built
2015
10 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
492
2023 count
Owner
State
State Highway Agency

About this bridge

SR 4012 over Tributary Ulsh Gap Run is a concrete culvert carrying SR 4012 over Tributary Ulsh Gap Run in Snyder County, Pennsylvania. It was built in 2015, so it is 10 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 492 vehicles a day, roughly 16% of them trucks, projected to reach 415 by 2038. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 26.7 mi (43 km).

CarriesSR 4012
CrossesTributary Ulsh Gap Run
Location2 MI NE of Bannerville
RouteState Highway 0
Coordinates40.7582, -77.31481
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.8 US tons
Inventory rating39.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic492 (2023)
Projected traffic415 by 2038
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.7 mi (43 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 4012 over Tributary Ulsh Gap Run built?

It was built in 2015, making it 10 years old in 2025.

What condition is SR 4012 over Tributary Ulsh Gap Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR 4012 over Tributary Ulsh Gap Run carry?

About 492 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is SR 4012 over Tributary Ulsh Gap Run?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m).

Who owns SR 4012 over Tributary Ulsh Gap Run?

It is owned by the State Highway Agency.