Stage RD over Over Ulsh Gap Run
GoodSnyder County, Pennsylvania · Village of Bannerville · Structure no. 000000000031257
- Built
- 1953
- 72 years old, rebuilt 2007
- Condition
- Good
- inspected February 2024
- Type
- Channel Beam
- Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 413
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Stage RD over Over Ulsh Gap Run is a concrete channel beam carrying Stage RD over Over Ulsh Gap Run in Snyder County, Pennsylvania. It was built in 1953 and reconstructed in 2007, so it is 72 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 413 vehicles a day, roughly 9% of them trucks, projected to reach 489 by 2032. The structure is 33 ft (10.1 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stage RD over Over Ulsh Gap Run built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 2007.
What condition is Stage RD over Over Ulsh Gap Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Stage RD over Over Ulsh Gap Run carry?
About 413 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is Stage RD over Over Ulsh Gap Run?
The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 33 ft wide.
Who owns Stage RD over Over Ulsh Gap Run?
It is owned by the State Highway Agency.