SR 244-PA 244 over Irish Settlement Brook
GoodPotter County, Pennsylvania · 1 MI South of Genesee · Structure no. 000000000042046
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 217
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 244-PA 244 over Irish Settlement Brook is a prestressed concrete box beam or girders - multiple carrying SR 244-PA 244 over Irish Settlement Brook in Potter County, Pennsylvania. It was built in 2003, so it is 22 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 217 vehicles a day, roughly 11% of them trucks, projected to reach 259 by 2043. The structure is 40 ft (12.2 m) long and 37 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 244-PA 244 over Irish Settlement Brook built?
It was built in 2003, making it 22 years old in 2025.
What condition is SR 244-PA 244 over Irish Settlement Brook in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does SR 244-PA 244 over Irish Settlement Brook carry?
About 217 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 244-PA 244 over Irish Settlement Brook?
The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.6 m) and a deck 37 ft wide.
Who owns SR 244-PA 244 over Irish Settlement Brook?
It is owned by the State Highway Agency.