T-371 Butter CR RD over Honeoye Creek
FairPotter County, Pennsylvania · 0.14 MI from Lr 52014 · Structure no. 000000000040497
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 51
- 2015 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-371 Butter CR RD over Honeoye Creek is a prestressed concrete box beam or girders - multiple carrying T-371 Butter CR RD over Honeoye Creek in Potter County, Pennsylvania. It was built in 1999, so it is 26 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 51 vehicles a day, roughly 2% of them trucks, projected to reach 101 by 2035. The structure is 50 ft (15.2 m) long and 20 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-371 Butter CR RD over Honeoye Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is T-371 Butter CR RD over Honeoye Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does T-371 Butter CR RD over Honeoye Creek carry?
About 51 vehicles per day (2015 count), of which roughly 2% are trucks.
How long is T-371 Butter CR RD over Honeoye Creek?
The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 20 ft wide.
Who owns T-371 Butter CR RD over Honeoye Creek?
It is owned by the Town or Township Highway Agency.