T-376 Post Hllw RD over Oswayo Creek
FairPotter County, Pennsylvania · 0.2 MI South of SR 44 · Structure no. 000000000030465
- Built
- 1912
- 113 years old, rebuilt 2000
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 49 ft
- 1 main span
- Daily traffic
- 50
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-376 Post Hllw RD over Oswayo Creek is a steel stringer/multi-beam or girder carrying T-376 Post Hllw RD over Oswayo Creek in Potter County, Pennsylvania. It was built in 1912 and reconstructed in 2000, so it is 113 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 70 by 2037. The structure is 49 ft (14.9 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-376 Post Hllw RD over Oswayo Creek built?
It was built in 1912, making it 113 years old in 2025. It was reconstructed in 2000.
What condition is T-376 Post Hllw RD over Oswayo Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does T-376 Post Hllw RD over Oswayo Creek carry?
About 50 vehicles per day (2017 count).
How long is T-376 Post Hllw RD over Oswayo Creek?
The structure is 49 ft (14.9 m) long with a longest span of 48 ft (14.6 m) and a deck 18 ft wide.
Who owns T-376 Post Hllw RD over Oswayo Creek?
It is owned by the Town or Township Highway Agency.