SR 0084 I-84 EB over Schocopee RD T-428
GoodPike County, Pennsylvania · Mlfrd Twp Ovr T-428 RD · Structure no. 000000000029856
- Built
- 1969
- 56 years old, rebuilt 2015
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 496 ft
- 6 main spans
- Daily traffic
- 9,358
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0084 I-84 EB over Schocopee RD T-428 is a steel stringer/multi-beam or girder carrying SR 0084 I-84 EB over Schocopee RD T-428 in Pike County, Pennsylvania. It was built in 1969 and reconstructed in 2015, so it is 56 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,358 vehicles a day, roughly 29% of them trucks, projected to reach 13,869 by 2032. The structure is 496 ft (151.2 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0084 I-84 EB over Schocopee RD T-428 built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2015.
What condition is SR 0084 I-84 EB over Schocopee RD T-428 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does SR 0084 I-84 EB over Schocopee RD T-428 carry?
About 9,358 vehicles per day (2023 count), of which roughly 29% are trucks.
How long is SR 0084 I-84 EB over Schocopee RD T-428?
The structure is 496 ft (151.2 m) long with a longest span of 136 ft (41.5 m) and a deck 36 ft wide.
Who owns SR 0084 I-84 EB over Schocopee RD T-428?
It is owned by the State Highway Agency.