US Bridges

SR 0084 I-84 EB over Schocopee RD T-428

Good

Pike County, Pennsylvania · Mlfrd Twp Ovr T-428 RD · Structure no. 000000000029856

Built
1969
56 years old, rebuilt 2015
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
496 ft
6 main spans
Daily traffic
9,358
2023 count
Owner
State
State Highway Agency

About this bridge

SR 0084 I-84 EB over Schocopee RD T-428 is a steel stringer/multi-beam or girder carrying SR 0084 I-84 EB over Schocopee RD T-428 in Pike County, Pennsylvania. It was built in 1969 and reconstructed in 2015, so it is 56 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,358 vehicles a day, roughly 29% of them trucks, projected to reach 13,869 by 2032. The structure is 496 ft (151.2 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 0084 I-84 EB
CrossesSchocopee RD T-428
LocationMlfrd Twp Ovr T-428 RD
RouteInterstate 84
Coordinates41.3401, -74.82466
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating66 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans6
Design loadHL 93
Structure length496 ft (151.2 m)
Longest span136 ft (41.5 m)
Deck width36 ft (11.1 m)
Roadway width32 ft (9.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,358 (2023)
Projected traffic13,869 by 2032
Trucks29%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$872,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 0084 I-84 EB over Schocopee RD T-428 built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2015.

What condition is SR 0084 I-84 EB over Schocopee RD T-428 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does SR 0084 I-84 EB over Schocopee RD T-428 carry?

About 9,358 vehicles per day (2023 count), of which roughly 29% are trucks.

How long is SR 0084 I-84 EB over Schocopee RD T-428?

The structure is 496 ft (151.2 m) long with a longest span of 136 ft (41.5 m) and a deck 36 ft wide.

Who owns SR 0084 I-84 EB over Schocopee RD T-428?

It is owned by the State Highway Agency.