US Bridges

SR 2023 over Over Rdg Blmt/Northernrr

Good

Northumberland County, Pennsylvania · 1.5 MI S of Mount Carmel · Structure no. 000000000042990

Built
2005
20 years old
Condition
Good
inspected November 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
87 ft
1 main span
Daily traffic
2,316
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2023 over Over Rdg Blmt/Northernrr is a prestressed concrete box beam or girders - multiple carrying SR 2023 over Over Rdg Blmt/Northernrr in Northumberland County, Pennsylvania. It was built in 2005, so it is 20 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,316 vehicles a day, roughly 6% of them trucks, projected to reach 2,681 by 2032. The structure is 87 ft (26.5 m) long and 43 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesSR 2023
CrossesOver Rdg Blmt/Northernrr
Location1.5 MI S of Mount Carmel
RouteState Highway 0
Coordinates40.7732, -76.40448
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length87 ft (26.5 m)
Longest span86 ft (26.2 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,316 (2024)
Projected traffic2,681 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 2023 over Over Rdg Blmt/Northernrr built?

It was built in 2005, making it 20 years old in 2025.

What condition is SR 2023 over Over Rdg Blmt/Northernrr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does SR 2023 over Over Rdg Blmt/Northernrr carry?

About 2,316 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SR 2023 over Over Rdg Blmt/Northernrr?

The structure is 87 ft (26.5 m) long with a longest span of 86 ft (26.2 m) and a deck 43 ft wide.

Who owns SR 2023 over Over Rdg Blmt/Northernrr?

It is owned by the State Highway Agency.