I-80 Eastbound over I-180 & SR 147 Mid-Point
GoodNorthumberland County, Pennsylvania · 2 MI N of Milton · Structure no. 000000000041763
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 227 ft
- 2 main spans
- Daily traffic
- 13,521
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-80 Eastbound over I-180 & SR 147 Mid-Point is a prestressed concrete continuous stringer/multi-beam or girder carrying I-80 Eastbound over I-180 & SR 147 Mid-Point in Northumberland County, Pennsylvania. It was built in 2002, so it is 23 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,521 vehicles a day, roughly 39% of them trucks, projected to reach 19,254 by 2032. The structure is 227 ft (69.2 m) long and 68 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-80 Eastbound over I-180 & SR 147 Mid-Point built?
It was built in 2002, making it 23 years old in 2025.
What condition is I-80 Eastbound over I-180 & SR 147 Mid-Point in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does I-80 Eastbound over I-180 & SR 147 Mid-Point carry?
About 13,521 vehicles per day (2024 count), of which roughly 39% are trucks.
How long is I-80 Eastbound over I-180 & SR 147 Mid-Point?
The structure is 227 ft (69.2 m) long with a longest span of 110 ft (33.5 m) and a deck 68 ft wide.
Who owns I-80 Eastbound over I-180 & SR 147 Mid-Point?
It is owned by the State Highway Agency.