S.R. 4016 over Over Plum Creek
FairNorthumberland County, Pennsylvania · 1.5 MI SE of Hamilton · Structure no. 000000000029293
- Built
- 1939
- 86 years old, rebuilt 1999
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 52 ft
- 1 main span
- Daily traffic
- 703
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
S.R. 4016 over Over Plum Creek is a steel stringer/multi-beam or girder carrying S.R. 4016 over Over Plum Creek in Northumberland County, Pennsylvania. It was built in 1939 and reconstructed in 1999, so it is 86 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 703 vehicles a day, roughly 6% of them trucks, projected to reach 1,098 by 2032. The structure is 52 ft (15.8 m) long and 25 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S.R. 4016 over Over Plum Creek built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1999.
What condition is S.R. 4016 over Over Plum Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does S.R. 4016 over Over Plum Creek carry?
About 703 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is S.R. 4016 over Over Plum Creek?
The structure is 52 ft (15.8 m) long with a longest span of 50 ft (15.2 m) and a deck 25 ft wide.
Who owns S.R. 4016 over Over Plum Creek?
It is owned by the State Highway Agency.